The Story
The MVP proved the product. Now it needed to scale.
Datum had validated its idea. The MVP was done, the product direction was clear, and full launch was next, which meant a large cross-functional team was about to build simultaneously on a product with real momentum. That's when the absence of a design system becomes expensive.











